New-build homes: slab edges and columns
Structure with the columns and slab edges treated before the external walls went up.



What was needed
Solving the structure’s thermal bridges in a new build.
What was done
Thermal break membrane on columns and slab edges.
How it was installed
- The work is done once the structure is up and before the façade is closed.
- Strips are cut to the size of the slab edge or column.
- They are fixed to the concrete, covering the whole face, and overlap the façade leaf.
- Check that no gaps are left uncovered before the external wall goes up.
Guidance installation for slab edges and columns. Ask us if you want more detail.
More projects
See all projects
3 photosAuditorium: columns and slab edges
Columns and slab edges lined before closing the façade.
Slab edges and columnsNew build
4 photosOffice building: slab edges
Façade with every slab edge treated, floor by floor.
Slab edges and columnsNew build
4 photosPig farm with the whole roof lined
The whole warehouse roof insulated from the inside, fitted from scaffolding.
RoofsRefurbishment