What was needed

Solving the structure’s thermal bridges in a new build.

What was done

Thermal break membrane on columns and slab edges.

How it was installed

  1. The work is done once the structure is up and before the façade is closed.
  2. Strips are cut to the size of the slab edge or column.
  3. They are fixed to the concrete, covering the whole face, and overlap the façade leaf.
  4. Check that no gaps are left uncovered before the external wall goes up.

Guidance installation for slab edges and columns. Ask us if you want more detail.